Sequoias Stadium
Sequoias Stadium opened in the fall of 2023 and was built around the previous COS practice field. Bleachers were added on both the east, west, and south end of the filed adding over 3,000 seats. A state of the art entry plaza was created, which hosts bathrooms, storage, and a snack bar, which is named “Timber’s Café.” The final stage of the project is completely renovating the track surface that will be completed in the spring of 2024.
Sequoias Stadium Photos
Porter Fieldhouse
The state of the art COS Porter Fieldhouse was opened in 2010 and is home to Giant Volleyball and Men’s & Women’s Basketball. An arena level light system was installed in the fall of 2019 and 16 foot video boards were installed in 2021.
Porter Fieldhouse Photos
Baseball Field
The COS baseball field preserves its vintage look while being completely renovated in the summer of 2016. A new scoreboard was put in place in 2015 and the locker room was renovated in 2020. The field also received a new home run fence in 2021.
Baseball Field Photos
Softball Field
COS boasts one of the nicest softball complex’s in the state which includes a state of the art locker room for the Giants, which was rennovated in 2023. Field padding was installed through the facility giving the COS softball field a four-year college feel.
Softball Field Photos
Aquatic Center
The COS pool is home to Giant Swimming and Diving teams and was completely renovated in the fall of 2018. The pool office was remodeled in 2021.
Aquatic Center Photos
Tennis Courts
The COS tennis courts were renovated in 2023 as a part of the overall Sequoia Stadium build. The courts are completed resurfaced; spectator-seating added, and two gardens with trees and shrubs were planted to add greenery to the facility.
Weight Room
The COS weight room was completed remodeled, which included all new equipment, in the summer of 2017. The weight room is home to all COS Student-Athletes.